| |
Open
House Summary, Sep. 18-20, 2007
Station
#1 - Study Overview CLICK
HERE to view highlights of the study process, the initial alternatives
and
street running.
Station #2 - Alternatives The Northside-Southside
Transit Improvements Study used the findings of the 2000
Major Transportation Investment Analysis (MTIA) as the starting
point for this study. CLICK HERE
to view all the alternatives considered for portions of North St.
Louis, South St. Louis and the downtown area and get a quick look
at the criteria the study team used to determine which transit routes
moved forward in the evaluation process.
Station #3 - Station Land Use and Street
Design To view the final station locations on the Detailed Alternatives
CLICK HERE.
Station #4 - Detailed Alternatives Evaluation
CLICK HERE to view the
results of the evaluation of the different routes under consideration
for selection of a Locally Preferred Alternative that travels from
Goodfellow Boulevard in North St. Louis to Bayless/Interstate 55
in South St. Louis.
Station #5 - Public Involvement
Key to the expansion of MetroLink is your involvement. CLICK
HERE to see a summary of how the public has been involved during
the course of the study.
Download
the Open House Boards - Part 1(8.6 MB PDF)
Download
the Open House Boards - Part 2 (3.2 MB PDF)
Back to Get Involved

|
|

 |
|