Search:     
 

Open House Summary, Sep. 18-20, 2007

Station #1 - Study Overview  CLICK HERE to view highlights of the study process, the initial alternatives and
street running.

Station #2 - Alternatives The Northside-Southside Transit Improvements Study used the findings of the 2000
Major Transportation Investment Analysis (MTIA) as the starting point for this study. CLICK HERE to view all the alternatives considered for portions of North St. Louis, South St. Louis and the downtown area and get a quick look at the criteria the study team used to determine which transit routes moved forward in the evaluation process.

Station #3 - Station Land Use and Street Design To view the final station locations on the Detailed Alternatives CLICK HERE.

Station #4 - Detailed Alternatives Evaluation  CLICK HERE to view the results of the evaluation of the different routes under consideration for selection of a Locally Preferred Alternative that travels from Goodfellow Boulevard in North St. Louis to Bayless/Interstate 55 in South St. Louis.

Station #5 - Public Involvement Key to the expansion of MetroLink is your involvement. CLICK HERE to see a summary of how the public has been involved during the course of the study.


Download the Open House Boards - Part 1(8.6 MB PDF)
Download the Open House Boards - Part 2 (3.2 MB PDF)
Back to Get Involved



 

 
 
Northside-Southside Study c/o Vector Communications | 701 N. 15th St. | Mailbox 43 | St. Louis, MO 63103 | (314) 621-3385